Multi-Site Commercial Solar PV Design and Installation

Turnkey Solution from Design to Installation

Project Management Company / Large Industrial Client
Sector: Oil and Gas

Background
Hyperion Zero Ltd delivered three commercial rooftop PV systems across a large industrial client’s Scottish estate in the north east of Scotland: 188.37 kWp, 135.59 kWp, and 59.15 kWp. The project required structural surveys, DNO G99 applications, specialist mounting systems, industrial facility access planning, and strict H&S compliance.

The Challenge

The project required simultaneous delivery across three operational industrial facilities, coordination with the DNO, and installation within live high‑risk industrial environments. Minimising disruption, maintaining safety, and adhering to a tight programme across dispersed sites were key challenges.

Our Solution

Hyperion Zero undertook full turnkey delivery including design, structural confirmation, DNO liaison, equipment procurement, installation, testing and commissioning. Dedicated Site Supervisors were assigned to each site, and ISO9001/ISO45001 systems ensured quality and safety. Programme sequencing allowed efficient multi‑site operation.
Integrated Multi-Site Project Planning & Phasing
Bespoke Structural & Mounting Design
Comprehensive DNO & Grid Connection Management (G99)
Robust Health, Safety & Quality Management
Optimised System Design for Performance & Maintainability
Sustainability & Waste Management

Outcomes & Benefits

Total installed capacity: 383.11 kWp
Delivered on programme and within budget
Expected annual generation: 320,000 kWh
CO₂ offset: approx. 64 tonnes annually
>95% waste recycling rate
No H&S incidents and fully compliant handover documentation